5Neron E,Baptisteb P,Gupta J N D.Solving hybrid flow shop problem using energetic reasoning and global operations[J].Omega,2001,29(6):501-511.
6Iiro Harjunkoski,Ignacio E Grossmann.A decomposition approach for the scheduling of a steel plant production[J].Computers and Chemical Engineering,2001,25(11):1 647-1 660.
7Park H,Hong Y,Chang S Y.An efficient scheduling algorithm for the hot coil making in the steel mini-mill[J].Production Planning & Control,2002,13(3):298-306.
8Peter C,Wafa R.Integration of continuous caster and hot strip mill planning for steel production[J].Journal of Scheduling,2000,3(4):185-208.
9Tang L X,Liu J Y,Rong A Y,et al.A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex[J].European Journal of Operational Research,2000,124(2):267-282.
10Flexsim User Guide.Version2.6[Z].Flexsim Software Products,Inc.