摘要
微山湖二线船闸工程是为了解决微山湖通航现有船闸的瓶颈问题 ,利用水流二维模型研究了设计方案的通航水流条件 ,同时进行了水文参数不同重现期的数值推算、工程对泄洪可能产生的影响。
The purpose of Two way Lock Project of Weishan Lake is to tackle the bottlenecked problem of the existing lock in navigation.Navigable flow condition of the design proposal is studied by 2 dimentional flow model.At the same time,the numerical calculations of hydrological parameters in different return periods are performed,and the influence of construction on the flood carrying capacity and that of the water diversion on navigation is studied as well.
出处
《水道港口》
2002年第3期111-115,共5页
Journal of Waterway and Harbor