摘要
涪江吴家街电航枢纽工程系裁弯取直工程。通过正态物理模型试验 ,分析了不同运行方案情况下 ,引水渠取水口通航水流条件。研究表明 ,对水库的调度运行方案及取水口平面布置进行优化后 。
Wujiajie Hydro junction is a cut-bend Project.From the normal scale physical mode test,navigable flow conditions of inlet of the approach channel is analyzed under various operational plans.From the sudy,it'shown that the problems of navigation and electricity supply can be solved,when the layout and the reservoir maneuver scheme is optimized.
出处
《水道港口》
2002年第3期127-131,137,共6页
Journal of Waterway and Harbor