摘要
针对龙岩漳龙高速公路乌石山隧道右线进口施工中发生山体滑坡的情况 。
Aiming at the massif slide happened at the entrance of right line of Wushishan tunnel during the construction of Longyan-Zhanglong Expressway, the provides the regulation measures for massif slide
出处
《广西交通科技》
2002年第3期47-50,共4页
Guangxi Communication Science & Technology