期刊文献+

微倾坍塌爆破拆除框架结构厂房 被引量:1

BLASTING DEMOLITION OF A FRAME FACTORY HOUSE WITH TINY INCLINE AND COLLAPSING
下载PDF
导出
摘要 高约 2 3m的待拆厂房 ,其一侧位于须保护厂房的两根立柱之间 ,相距仅 5 0cm。另一侧 8 5m之外也是须保护的厂房。在此复杂条件下 ,采用了先使厂房微倾斜尔后定向倒塌的方案。通过合理确定整体微倾角度、柱底破坏高度、微差时间和孔网参数 ,成功地爆破拆除了框架结构厂房 。 A side of a 23m height factory house to be demolished is located between two pillars of the building necessary to be protected,with the space of only 50cm Yet,another building necessary to be protected is 8 5m out of its opposite In so complicated conditions,the blasting scheme of tiny inclining followed by directional collapsing is adopted Through reasonable determination of tiny inclining angle,cut height,delayed interval and hole pattern parameters,the frame factory house is successfully demolished by blasting The buildings to be protected are in good condition
出处 《工程爆破》 2002年第3期36-38,共3页 Engineering Blasting
关键词 微倾坍塌 框架结构厂房 起爆网络 爆破设计 爆破拆除 安全防护 Demolition blasting Collapsing Frame structrue Factory house
  • 相关文献

参考文献3

二级参考文献5

共引文献89

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部