针对石头河水库右坝肩发生病害情况 ,介绍了按所定加固方案在高水位情况下建造混凝土防渗墙的施工工艺及方法。施工检测及渗流观测结果表明 ,防渗墙施工质量良好 。
Pointing to the dangerous conditions at right dam abutment of Shitouhe Reservoir, this paper introduces the construction technology and method of concrete cutoff wall built in high water level according to a given strengthening scheme. The results from the construction check measurement and seepage observation indicate that both of the construction quality and the primary effect of seepage control of the cutoff wall are fine.