摘要
以天下城———都市辉煌苑 1号楼高层住宅楼多支盘桩桩基监理为例 ,从成桩机理、工艺特点、施工难点入手 ,以工序质量控制为核心 ,设置质量控制点 ,进行预控 ,最终达到理想的监理效果。
In our supervision process in the cast-in-place pile with branches and plates of the No.1 building in Downtown Plaza,considering the forming mechanism,the characteristic of method and the key points in the construction of this kind of pile,the quality control on process is considered as one of the important points,and the pre-control on the pile is brought into being by setting the quality control points.The results show the effectiveness of the work.
出处
《平顶山工学院学报》
2002年第3期21-23,共3页
Journal of Pingdingshan Institute of Technology
关键词
多支盘灌注桩
承力盘
工序质量控制
cast-in-place pile with branches and plates
plate
pre-control
project quality control
main points about project quality