摘要
结合新奥法施工的需要 ,确定京珠高速公路粤境北段砒霜坳隧道左、右线必测项目和选测项目 ,介绍了主要量测方法 。
To the need of the NATM construction, the reguired and the optional items of Pishuangao tunnel were detemined which is locatecl at the north part of Yue region on Tin zhu express highway Introduction is given to major montoring & control methods. And an analysis is made to the results.
出处
《石家庄铁道学院学报》
2002年第B08期18-20,共3页
Journal of Shijiazhuang Railway Institute