摘要
详述了 2 4 m预应力混凝土单线并置式箱型简支梁的预制施工过程中的各关键技术 。
This paper describes the relevant construction measures in detail in process of prefabricating construction of 24m prestressed concrete single line parallel laid simply support box beam it can be useed for reference to similar bridge structure prefabricating works
出处
《石家庄铁道学院学报》
2002年第B08期63-65,共3页
Journal of Shijiazhuang Railway Institute