摘要
通过对新白云机场航站楼建设的实践 ,文中对冲孔灌注桩的实施过程中遇到的问题及解决方法进行总结 ,提出在溶岩地质条件下进行基础工程建设的建议和体会。
This paper sums up the problem met in utilization of punch filling pile and its solution through the practice of constructing the Terminal of Guangzhou new Baiyun International Airport.It also raises a proposal and an idea of doing foundation construction under karstic geological condition
出处
《交通科技》
2002年第4期10-14,共5页
Transportation Science & Technology