摘要
一循环 7座逆流式冷却塔经过分期改造 ,单塔处理能力提高 5 0 %。对逆流式冷却塔的改造技术及效果进行了分析与评价 ,并就淋水填料、布水器的选型及风道系统的改进作进一步探讨。经过 2a的运行实践表明 ,改造后一循环的整体冷却能力明显增强 。
The capacity of the counter flow cooling tower in No.1 Circulating Cooling Water System,which consists of 7 rooms,is increased by 50%,after having been reinforced and reformed by stages. The reforms in the counter flow cooling tower and their effects have been analyzed and evaluated. The drip stuffing,the choosing of water distributor and the improvement of air conduit system have been discussed. The two year running practice shows that the capacity of the counter flow cooling tower in No.1 circulating cooling water system is increased apparently, and can meet the requirements of the production with high efficiency.
出处
《工业水处理》
CAS
CSCD
2002年第9期45-47,49,共4页
Industrial Water Treatment
关键词
逆流式冷却塔
技术改造
水处理装置
circulating cooling water
cooling tower
techniques
efficiency