摘要
本文阐述了CL新型结构体系中的CL墙板的预制、安装 ,及CL结构体系墙体支模、钢筋绑扎 。
The construction techniques of CL structure complex, the prefabrication and installation of CL wall board, supporting the framework of the wall body, binding reinforcing bar and pouring the concrete on-the-spot, all are expounded in this paper.
出处
《河北建筑科技学院学报》
2002年第3期33-35,共3页
Journal of Hebei Institute of Architectural Science & Technology