摘要
介绍上犹江水电厂水轮机增容改造后的效率试验过程及效率曲线与运转综合特性曲线的绘制。
This paper introduces racing of original integrated operation characteristic curves and efficiency curves after uprating and refurbishing hydrogenerator of shangyoujiang power plant.
出处
《江西电力》
2002年第4期1-3,8,共4页
Jiangxi Electric Power