摘要
从自然因素与人为因素两个分析了滑坡形成的原因、动力来源和激发条件 ,阐述了滑坡形成过程、活动现状及发展趋势。依据以上原因 ,提出了抗滑锚固桩抗滑、浆砌石护坡、谷坊和潜槛固沟防冲、场区防渗排水、并加固场区地基的综合措施来治理滑坡 ,治理工程于 1999年 7月完成 ,保证热电联产厂的正常工作。而且经过治理后两年的运行 。
LANGJIU's thermoelectricity factory landslide,about 7×10 4 m 3 in volume,is located on the left band of CHISHUI river.In This paper the cause,dynamics and mobilization as well as the developing of the landslide,are analyzed from two aspects, the natural and artificial. According to comprehensive planning for control,measurements,such as drainage words,anti slipping piles ,retain walls,groundwork dispose have been employed in July ,1999.Two years later,the slide body has reached a trending to stable state.
出处
《山地学报》
CSCD
2002年第5期621-627,共7页
Mountain Research
基金
中国科学院知识创新项目"进藏公路铁路典型路段工程减灾理论与对策研究"资助
项目编号KZCX2 -3 0 6。