摘要
典型施工工艺条件下,地铁车站与下穿桥结构一体化施工的相关研究较少。本文采用有限元软件MIDAS/GTS对合肥地铁一号线某地铁站的深基坑工程的施工过程采用分段明挖顺作法进行数值模拟分析,并将地表沉降模拟结果与监测数据进行比较。研究表明:长条形地铁车站明挖+局部盖挖+分段分层对称的复合开挖方式对地表沉降的影响较小,且开挖面的转移会使地表沉降产生突变。该结论可为今后合肥类似的地铁车站建设提供参考。
Under the condition of typical construction technology,there is little research on the integratedconstruction of the metro station and the underbridge structure.The finite element software MIDAS/GTS wasadopted to make a numerical simulation of the deep foundation pit of Hefei metro 1# station,and the simulationresults were compared with the monitoring settlement data.Analysis showed that the complex excavation methodconsisting of open excavation of long strip subway station,covered excavation,and the symmetrical segmentation andlayer method had smaller effect on the ground surface settlement,and the transfer of excavated surfaces influencedthe surface subsidence.The conclusion can provide reference for the construction of similar subway station in Hefeiin the future.
作者
郭小娜
程桦
盛飞国
GUO Xiaona;CHENG Hua;SHENG Feiguo(School of Civil Engineering,Anhui Jianzhu University, Hefei, 230022, China;Anhui University Hefei, 230031, China)
出处
《安徽建筑大学学报》
2016年第3期12-16,共5页
Journal of Anhui Jianzhu University
关键词
地铁车站
深基坑
地表沉降
数值模拟
监测
metro station
deep foundation pit
ground surface settlement
numerical simulation