港珠澳大桥岛隧工程沉管一次舾装安装工艺 被引量:5

Installation technology for one-go outfitting of immersed tunnel sections for island and tunnel project of Hongkong-Zhuhai-Macao Bridge
下载PDF
导出
摘要 根据港珠澳大桥岛隧工程沉管舾装工艺要求,编制了沉管预制一次舾装施工方案。文章重点分析压舱系统、钢封门安装技术及质量控制要点。对类似工程具有一定的借鉴作用。 According to the requirements for outfitting of immersed tunnel sections for the island and tunnel project of Hongkong-Zhuhai-Macao Bridge, an overall plan for one-go outfitting of precast tunnel sections was prepared. The paper focuses on the analysis of the installation technology and quality control system for the ballasting system and the steel seal doors, which provides reference for similar projects.
作者 唐永波 魏杰 周建民 TANG Yong-bo;WEI Jie;ZHOU Jian-min(Shanghai Zhenhua Heavy Industries Co., Ltd., Shanghai 201913, China)
出处 《中国港湾建设》 2016年第7期69-72,共4页 China Harbour Engineering
关键词 一次舾装 施工方案 质量控制 one-go outfitting construction plan quality control
  • 相关文献

参考文献4

二级参考文献8

  • 1GB 50496--2009,大体积混凝土施工规范[S].
  • 2中交股份联合体港珠澳大桥岛隧工程第Ⅲ工区二分区项目经理部.港珠澳大桥岛隧工程一次舾装及水密性试验专项施工方案[R].2012.
  • 3中交股份联合体港珠澳大桥岛隧工程第V工区项目经理部.港珠澳大桥岛隧工程沉管二次舾装施工方案[R].2013.
  • 4中国船舶工业总公司.船舶设计实用手册:舾装分册[M].北京:国防工业出版社,2013:443-452.
  • 5中交股份联合体港珠澳大桥岛隧工程第V22区项目经理部.港珠澳大桥岛隧工程沉管安装施工风险管理手册:舾装分册[K].2013.
  • 6杨绍斌,苏怀平,张洪.大体积混凝土入模温度控制研究[J].中国港湾建设,2013,33(4):38-41. 被引量:11
  • 7李阳,杨红.工厂法沉管预制混凝土泵送施工技术[J].中国港湾建设,2015,35(5):56-61. 被引量:3
  • 8张洪,范卓凡,刘然.港珠澳大桥岛隧工程沉管预制模板施工工艺[J].中国港湾建设,2015,35(7):57-60. 被引量:14

共引文献8

同被引文献27

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部