摘要
塔群的高塔管线安装存在工作量大、施工难度高等特点,合理优化高塔管线的施工方案和施工计划,不仅可以节约施工过程中所耗的人力和物力,还可缩短整个项目的施工工期。
The pipeline on high tower installation in multi-towers features difficult construction and large work load.Theoptimization on construction plan and schedule can not only reduce manpower and resources,but also shorten the time of the project.
作者
宁淑晖
Ning Shuhui(Xinjiang Dushanzi Station of Construction Quality Supervision,Karamay 833699,China)
出处
《石化技术》
CAS
2016年第3期79-79,103,共2页
Petrochemical Industry Technology
关键词
塔群
高塔管线安装
支架定位
multi-towers
pipeline installation on high tower