本文阐述了采用潜水员进行系泊锚缆及锚链水下快速连接的施工工艺,以及施工过程中用到的辅助结构,对深水锚系安装有一定借鉴意义。
The mooring system of floating production facility is mainly provided the mooring restoring force by its mooring leg system which is generally made of anchor,mooring chain and wire. How to connect mooring chain and wire quickly during mooring system subsea installation progress is always a hotspot that is studied and discussed in industrial community. This paper states subsea quick connection technology of mooring chain and wire by saturation diver,as well describes auxiliary structure related to the subsea construction progress. The construction technology described herein is simple,efficient and operational safety. It is worthy to spread and applied,and also has certain reference significance to mooring installation in deepwater.