系泊锚缆及锚链水下快速连接施工工艺

Subsea quick connection technology of mooring chain and wire
下载PDF
导出
摘要 本文阐述了采用潜水员进行系泊锚缆及锚链水下快速连接的施工工艺,以及施工过程中用到的辅助结构,对深水锚系安装有一定借鉴意义。 The mooring system of floating production facility is mainly provided the mooring restoring force by its mooring leg system which is generally made of anchor,mooring chain and wire. How to connect mooring chain and wire quickly during mooring system subsea installation progress is always a hotspot that is studied and discussed in industrial community. This paper states subsea quick connection technology of mooring chain and wire by saturation diver,as well describes auxiliary structure related to the subsea construction progress. The construction technology described herein is simple,efficient and operational safety. It is worthy to spread and applied,and also has certain reference significance to mooring installation in deepwater.
出处 《石化技术》 CAS 2016年第4期25-26,共2页 Petrochemical Industry Technology
  • 相关文献

参考文献3

  • 1房晓明.文昌油田单点系泊系统海上安装[J].中国海上油气(工程),2003,15(1):1-11. 被引量:12
  • 2蔡长松等. DSV Connection of LCS and LWS Procedure.深圳海油工程水下技术有限公司,2014.
  • 3段立志等. DSV Connection of LCS And LWS Analysis.深圳海油工程水下技术有限公司.

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部