摘要 补连塔选煤厂针对新建2^(-2)煤系统生产能能力不足,系统工艺故障多,实际运行达不到设计预期,精煤脱介筛卡堵严重,重介质旋流器跑煤严重等一系列问题,进行了系统分析与优化改造。改造后,系统的灵活性、稳定性、生产效率和产品质量都有提高,每年可为企业降本增效5000万元。 Bulianta coal preparation plant conducts system analysis and optimal transform for a series of prob?lems:new 2-2 coal production system's insufficient production capacity,many failures of the process system,the actual operation fall flat to the expected design,serious clean coal sculping screen blocking and heavymedium hydrocyclones coal leakage. After transformation,flexibility,stability of the system,productivity andproduct's quality had got improved,50 million annual profits has been obtained.
作者 党立伟 王忠 王斌 DANG Liwei;WANG Zhong;WANG Bin(The Equipment Management Center of Shendong Coal Group Company,ShenMu,ShaanXi,719315;Shendong Coal Group Company Coal Preparation Center Bulianta Coal Preparation Plant,Erdos,Inner Mongolia,017209)
出处 《神华科技》 2016年第4期20-23,共4页 Shenhua Science and Technology
关键词 洗选系统 改造 实践 Washing System Transformation Practice
  • 相关文献

同被引文献31

引证文献12

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部