期刊文献+

彭庄煤矿副井提升系统连续供电设计

Continuous power supply design Peng Zhuang during coal mine hoisting system
下载PDF
导出
摘要 矿井主提升设备的安全、可靠、高效运行,直接关系着煤矿企业的经济效益及人员安全;副井提升系统对供电电源质量提出了更高的要求。本文结合固态切换开关SSTS产品性能及彭庄煤矿副井提升供电系统实际,对副井提升系统安全连续性供电提出了设计。 The safety, reliable, efficient operation of the mine main lifting equipment is directly related to the coalmine enterprise economic benefits and personnel safety; auxiliary shaft hoisting system puts higher requirementson the quality of power supply. Based on solid state switching switch SSTs product performance and Peng Zhuangcoal mine auxiliary shaft upgrade power system practice, the safe and continuous power supply design scheme of theauxiliary shaft hoisting system is put forward.
作者 翟元军 Zhai Yuan-jun(Linyi Mining Group Heze coal company in Pengzhuang coal mine,Shandong Heze 274700)
出处 《山东煤炭科技》 2016年第10期102-104,共3页 Shandong Coal Science and Technology
关键词 提升系统 连续供电 设计 hoisting system continuous power supply design
  • 相关文献

参考文献4

二级参考文献1

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部