轨道交通盾构隧道下穿铁路线施工技术分析 被引量:4

Analysis on Construction Technology of Rail Transit Shield Tunnel underneath Railway Line
下载PDF
导出
摘要 西安市轨道交通L3胡家庙站—石家街站盾构区间穿越陇海铁路线总体工程建设风险为Ⅰ级。为了解决黄土地区盾构下穿陇海铁路施工中地面沉降、管片上浮等施工技术难题,通过风险分析和盾构试验段施工,获得如下结论:采取地面沉降和管片上浮控制、监控测量等技术措施,使得Ⅰ级风险点累计最大沉降为-4.39 mm,Ⅱ级风险点累计最大沉降为-15.2 mm,满足产权单位-6 mm和-20 mm沉降控制要求,保证既有线安全,取得良好的经济效益和社会效益。 With background of Xi'an Rail Transit L3 project,the overall construction risk of shield interval of Hujiamiao Station and Shijiajie Station crossing Longhai Railway is evaluated as Grade Ⅰ.In order to solve the problem of construction technology such as land subsidence and pipe floating in the construction of the Longhai Railway under shield machine in loess area,according to the shield across Longhai Railway risk analysis and the shield test section construction,the conclusions are obtained as followed:taking use of some technical measures such as ground subsidence,segments floating control and monitoring measurement,the cumulative maximum settlement of the Grade Ⅰ risk point is-4.39 mm,and the same value of the Grade Ⅱ risk point is-15.2 mm,which can meet the settlement control requirements of the property units-6 mm and-20 mm and can ensure the security of the existing line and moreover achieve good economic & social benefits.
作者 王住刚
出处 《中国市政工程》 2016年第5期42-45,100,共4页 China Municipal Engineering
关键词 土压平衡 地面沉降 管片上浮 三级预警 earth pressure balance ground subsidence segment floating three-level warning
  • 相关文献

参考文献3

二级参考文献26

共引文献70

同被引文献27

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部