摘要 城市隧道、地下轨道等地下结构工程,常因施工缝、变形缝、后浇带等薄弱部位的施工质量不佳引起渗漏水,其治理方法因环境和渗漏程度各异而不同。武汉东湖通道工程在治理因施工缝和变形缝引起的渗漏水质量通病时,采取传统堵漏工艺与新型材料相结合的方法进行治理,效果较好。 The leakage water of underground structures such as urban tunnels and underground railways are often caused by poor constructionquality due to poor construction joints, deformation joints, and post-pouring zones. The treatment methods vary depending on the environment and the degree of leakage. Wuhan East Lake channel project is adopting the combined method of traditional plugging process and new materials to make treatment and achieve great effects when treating the leakage water caused by construction joints and deformation joints.
出处 《中国市政工程》 2016年第5期50-52,共3页 China Municipal Engineering
关键词 通道 施工缝 变形缝 渗漏水 原因分析 传统工艺 新型材料 效果 channel construction joint deformation joint leakage water cause analysis traditional technology new material effects
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部