摘要
为了研究高抽巷合理的布置位置,根据淮南矿区13-1煤的实际开采条件和上覆岩层特征,采用理论计算、相似模拟试验和现场施工观测等方法,研究分析了高抽巷合理的布置层位和对瓦斯抽采效果的影响。结果表明:13-1煤工作面垮落带高度约是采高的4倍、裂缝带高度约是采高的16倍,高抽巷合理布置层位约为距煤层顶板42m,利用相似模拟材料试验结果来确定高抽巷布置层位更为合理。
In order to study the rational position of high drainage roadway, according mining situation and overburden strata charactersof 13-1 coal seam of Huainan mining area, and then theory calculation, similar simulation experiment and practical observation wereapplied, and gas drainage effect that influenced by rational position of high drainage roadway was studied. The results showed that thecollapsed zone height is four times of mining height in 13-1 working face, fracture zone height is 16 times of mining height. The rationaldistribution position of high drainage roadway to roof of coal seam is forty-two meters, and then the rational was verified by similar simulation.
作者
苗磊刚
石必明
秦如祥
MIAO Lei-gang;SHI Bi-ming;QIN Ru-xiang(Energy and Safety School, Anhui University of Science & Technology, Huainan 232001, China;Energy and Communication Engineering School, Jiangsu Construction Professional Technology School, Xuzhou 221116, China)
出处
《煤矿开采》
北大核心
2016年第6期77-80,共4页
Coal Mining Technology
基金
国家自然科学基金资助项目(51474010
11472007)
江苏省住建厅资助项目(2014ZD52)
国家安全生产监督管理局科技项目(jiangsu-002-2015AQ)
住建部资助项目(2016-R3-021)
江苏省大学生创新创业训练项目(201610849008Y)
关键词
高瓦斯工作面
高抽巷
相似模拟
瓦斯抽采
high gas working face
high drainage roadway
similar simulation
gas drainage