简谈P6软件在核电工程常规岛设计进度管理中的应用 被引量:2

Discussion on the Application of P6 Software in the Design Schedule Management of Nuclear Power Project
下载PDF
导出
摘要 为更好地应用P6软件对核电工程常规岛设计进度进行有效控制,国核电力院对P6软件进行了二次开发,与工程项目管理平台(EPMS)建立了接口关系,实现了P6与EPMS平台之间数据的同步传递,计划的实际执行数据实现了自动采集,大大提高了工作效率。 In order to effectively control the design schedule of the conventional island in nuclear power project, State Nuclear Electric Power Planning Design & Research Institute made secondary development on the P6 software. The interfaces were established to synchronize the data between P6 and the Engineering Project Management System (EPMS). The schedule execution data can be automatically collected, which greatly improved the work efficiency.
作者 赵春雨 吕科 张旭超 李肖肖 ZHAO Chunyu;LYU Ke;ZHANG Xuchao;LI Xiaoxiao(State Nuclear Electric Power Planning Design&Research Institute, Beijing 100095, China;State Grid JiBei Electric Power Company Limited Economic Research Institute, Beijing 100038, China)
出处 《能源研究与管理》 2016年第4期19-21,30,共4页 Energy Research and Management
关键词 P6软件 核电工程 工程项目管理平台 设计进度管理 P6 software nuclear power project engineering project management system design schedule management
  • 相关文献

参考文献3

共引文献10

同被引文献3

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部