摘要
在介绍AHP-熵权综合模型的基础上,以某集团固镇经济开发区2×15 MW供热电站工程为研究对象构建评价指标体系,并利用该评价体系对电厂总图运输设计方案进行评价,从而得出了总图方案各要素的优劣排序及需要改进的指标,最终为总平面布置优化提供了依据。
On the basis of the AHP-entropy weight fuzzy assignment combined model was introduced, as a research object of the 2伊15 MW fired power plants in economic development zone in Guzhen. Then evaluation indicator system wasestablished.Application of the model to evaluate the scheme of the fired power plants generallayout, it is sort the scheme and get the index which need to improve, finally provides a basis for general layout optimization.
作者
王丰
WANG Feng(China City Environment Protection Engineering Co.,Ltd., Wuhan 430081, China)
出处
《能源研究与管理》
2016年第4期31-33,38,共4页
Energy Research and Management