甘泉铁路部分桥墩托盘冻裂病害整治分析 被引量:1

Partial Pier Tray Frost Crack's Repairing and Analysis of Gansu Railway
下载PDF
导出
摘要 甘泉铁路防震落梁采用三角支架措施,施工时需将锚固角钢埋入墩顶托盘顶部的预留孔内,由于施工单位在部分地段安装时,未能有效处理孔内积水,导致桥墩墩顶托盘出现冻胀裂缝及防震落梁支架孔冻胀上浮。为防止病害进一步发展,确保铁路正常运营,甘泉铁路公司对冻裂托盘进行评估,并制定针对性的处置方案,有效防止病害发展,延长结构使用寿命。 Gansu Railway shock-proof beam using triangle support measures so that the steel anchor angleshould be buried in at the reserved hole of the tray of the pier top,since the construction unit failed to ef?fectively deal with water hole in some sections of the installation,leading the tray of the pier top appearfrost heaving cracks and shock beam falling support hole. To prevent the further development of frost heavefloating and to ensure the normal operation of the railway,Ganquan Railway Company evaluates the crackedtray,and makes the targeted disposal program,which effectively prevents the development of disease,andprolong the service life of the structure.
作者 夏群山 XIA Qunshan(Shenhua Ganquan Railway Limited Liability Company,Hailiutu,Inner Mongolia,015399)
出处 《神华科技》 2016年第6期85-88,共4页 Shenhua Science and Technology
关键词 墩顶托盘 防震落梁 裂缝 The Tray of the Pier Top Shock-proof Beam Crack
  • 相关文献

参考文献6

二级参考文献30

共引文献125

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部