期刊文献+

基于目标二元性的建设工程项目组织间冲突管理策略 被引量:1

Construction Project Inter-organizational Conflict Management Strategies Based on Goal's Ambidexterity
下载PDF
导出
摘要 在阐述目标二元性的相关概念基础上,本文明晰了建设工程项目组织间冲突的概念、特征和类别,通过剖析目标二元性在不同项目型组织中的体现,及其对建设工程项目控制目标和不同维度的组织间冲突的影响,得出目标二元性会加剧任务冲突,而对流程冲突、关系冲突和项目绩效的影响则具有两面性的结论。构建了基于目标二元性的冲突管理模型,提出合作型、竞争型、妥协型、回避型和迁就型五种冲突管理策略,以期为建设工程项目组织间冲突管理提供理论指导和决策借鉴。 Based on objective duality, the paper illustrates the concept, characteristics and category of inter-organizational conflict within construction project. By analyzing the reflection of objective duality in organizations with different types of projects and its influence on control objectives of construction project and inter-organizational conflict of different dimensions, the following conclusion is reached that objective duality canintensify task conflicts, and having a dual impact over process conflict, relation conflict and project performance.A model on conflict management based on objective duality is constructed with five types of strategies for conflict management, including cooperation, competition, compromise, avoidance and concession in order to provide meaningful reference to inter-organizational conflict management of construction project.
作者 吴光东 刘聪 Wu Guangdong;Liu Cong(School of tourism and urban management, Jiangxi University of Finance & Economics, Nanchang, Jiangxi 330013, China)
出处 《工程研究(跨学科视野中的工程)》 CSCD 2016年第6期633-643,共11页 JOURNAL OF ENGINEERING STUDIES
基金 项目导向型供应链跨组织知识流驱动项目价值增值的内在机制(71301065) 建设工程项目组织间冲突演化及其对价值增值的影响机理(71561009) 项目导向型供应链合作创新行为的形成机制及干预策略(2016M590605)
关键词 目标二元性 冲突管理 建设工程项目 objective ambidexterity conflict management construction project
  • 相关文献

参考文献15

二级参考文献157

共引文献171

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部