某风积沙隧道施工方案应用总结

Summary of Application of Construction Scheme for An Aeolian Sand Tunnel
下载PDF
导出
摘要 在千松坝隧道风积沙段开挖过程中,通过对"超前小导管注浆+四台阶法"、"超前大管棚注浆+三台阶临时仰拱法"和"水平旋喷桩+台阶临时仰拱分部开挖法"三种施工方案的摸索和实践,总结出适合风积沙隧道开挖的施工方案,并对各方案的收敛性等进行分析,以利于推广应用。 During the excavation process of aeolian sand section of Qiansongba Tunnel, the construction scheme that is suitable for aeolian sand tunnel excavation is summarized through the exploration and practice of three kinds of construction schemes like " advanced small pipe grouting + four - step m ethod" , " advanced large pipe shed grouting + temporaryinverted arch method for three - step" and " horizontal je t grouting pile + partial excavation method for temporary inverted arch of step" , and analyses on the convergence and so on of each scheme are made, so as to fa cilitate the promotion and application.
作者 安风华 AN Feng-hua(Hebei Provincial Communications Planning and Design Institute,Shijiazhuang 050011,China)
出处 《北方交通》 2016年第12期137-140,共4页 Northern Communications
关键词 隧道 风积沙 水平旋喷桩 小导管 大管棚 注浆 Tunnel Aeolian sand Horizontal jet grouting pile Small pipe Large pipe shed Grouting
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部