借鉴传统汽轮发电机现场验收及交接试验的质量管控经验,结合特高压直流输电工程大型调相机组的特定需求,对特高压直流输电工程300 MVar大型调相机组现场验收及交接试验过程中的质量管控技术进行了探讨。
Drawing on the experience of quality control in the site acceptance and handover test of traditional turbine generator, combined with UHVDC transmission project giant reactive power generating units specific needs, the quality control technology in the process of site acceptance and handover test of UHVDC transmission project 300 MVar giant reactive power generating units are discussed.
作者
陈文
杨俊涛
蔡万里
李中元
欧江陵
CHEN Wen;YANG Juntao;CAI Wanli;LI Zhongyuan;OU Jiangling(State Grid Hubei Electric Power Research Institute, Wuhan Hubei 430070, China;State Grid Shiyan Power Suply Company,Shiyan Hubei 442000,China;Hubei Fangyuan Dongli Electric Power Science & Research Limited Company,Wuhan Hubei 430077, China)
出处
《湖北电力》
2016年第5期16-19,共4页
Hubei Electric Power
关键词
特高压直流输电工程
大型调相机组
现场验收
交接试验
质量管控技术
UHVDC transmission project
giant reactive power generating units
site acceptance
handover test
quality control technology