为保证特高压直流输电工程配套大型调相机组的高效投产、安全运行,发挥其在交直流混联电网中的无功支撑作用,针对大型调相机组设备选型、制造、监造等方面的质量管控实施路线进行了探讨。本项目的实施可为特高压直流输电工程大型调相机组质量管控提供有效保障,确保工程的高效投产、安全运行,充分发挥其在交直流混联电网中的无功支撑作用。
In order to ensure the efficiently execution and the safety operation of the high-rating condenser in ultra high-voltage direct current project, and realize its reactive compensation func?tion in AC/DC hybrid power grid, implementation approach of the equipment selection, production and equipment supervision for high-rating condenser are studied in this article. The implementation of this project can provide effective protection for large generator phase of UHVDC transmission project quality control, to ensure the efficient operation of the project, the safe operation, which gives full play to its reactive power support in AC / DC hybrid power grid
作者
游力
吴磊
张明
王卫涛
YOU Li;WU Lei;ZHANG Ming;WANG Weitao(State Grid Hubei Electric Power Research Institute, Wuhan Hubei 430077, China;Huaneng Wuhan Power Generation Co. Ltd.,Wuhan Hubei 430415, China)
出处
《湖北电力》
2016年第5期20-23,共4页
Hubei Electric Power