摘要
改良品的订货问题一直没有引起足够的重视。分别建立持续补货模式下不允许缺货与允许缺货的改良品库存模型,并分析改良率与补货周期、各种费用参数的相关关系,研究表明:改良率与补货周期、单位时间存储费用呈负相关关系,与单位时间订货费用、单位时间改良费用、单位时间缺货费用、单位时间总费用呈正相关关系。同时,对不允许缺货与允许缺货的改良品库存模型单位时间总费用进行比较,并分析库存模型各参数对两种库存模型单位时间总费用差值的影响方式,研究表明:单位时间总费用差值与改良率、补充速率、单次订货费用、单位存储费用、单位改良费用呈正相关关系,与单位缺货费用成呈负相关关系,与需求速率的相关关系取决于补充速率与需求速率的大小关系。
The amelioration items ordering problem has not caused enough attention of the scholars. This paper establishesthe inventory model of not-allowable shortages and allowable shortages for ameliorating items with non-instantaneousreplenishment, and analyzes the correlation between the amelioration rate and the replenishment cycle, various parametersof cost. The results show that the amelioration rate is negatively related with the replenishment cycle and the storage costper unit time, and is positively related with the amelioration rate and the order cost per unit time and the amelioration costper unit time and the shortage cost per unit time and the total cost per unit time. Moreover, the paper compares notallowableshortages model with allowable shortages model about the total cost per unit time, and analyzes the effects ofvarious parameters to the difference of the total cost per unit time of two inventory models. The results show that thedifference of the total cost per unit time is positively related with the amelioration rate and the replenishment rate and theorder cost per time and the unit storage cost and the unit amelioration cost, and is positively related with the unit shortagecost, and exists the correlation with the demand rate dependent on the ratio relationship of the replenishment rate and thedemand rate.
作者
张云丰
王勇
ZHANG Yunfeng;WANG Yong(School of Management Engineering, Anhui Polytechnic University, Wuhu, Anhui 241000, China;School of Economics and Business Administration, Chongqing University, Chongqing 400030, China)
出处
《计算机工程与应用》
CSCD
北大核心
2017年第1期232-238,共7页
Computer Engineering and Applications
基金
国家自然科学基金(No.71272085
No.71171002)
教育部人文社会科学基金(No.12YJA630135
No.13YJA630021)
安徽省高校省级优秀青年人才基金重点资助项目(No.2013SQRW034ZD)
关键词
改良品
库存
持续补货
改良率
ameliorating items
inventory
non-instantaneous replenishment
amelioration rate