期刊文献+

重力坝底孔与中孔主要功能、布置原则、体型设计

Main Functions, Layout Principle and Configuration Design of Intermediate Outlets and Bottom Outlets of A Concrete Gravity Dam
下载PDF
导出
摘要 系统介绍大、中、小型混凝土重力坝中孔和底孔的设计,主要对其功能、布置原则、体型轮廓等。并以已建工程实例加以补充阐述,景洪水电站重力坝右冲沙泄洪底孔自投入运行以来,状况良好。 This paper systematically introduces the design of intermediate and bottom outlets of large-, mediumand small-sized concrete gravity dams, putting stress on their functions, layout principle and confi guration and shapes and bringing the completed projects in evidence. The right bank fl ushing and fl ood discharging outlets of the gravity dam of Jinghong Hydropower Plant have been under proper conditions since their operation.
作者 赵云秀 闫会宗 王亦锥 ZHAO Yun-xiu;YAN Hui-zong;WANG Yi-zhui(China Power Kunming Engineering Corporation Limited, Kunming 650051, Yunnan, China)
出处 《云南水力发电》 2016年第6期84-88,共5页 Yunnan Water Power
关键词 中孔 底孔 功能 布置 intermediate outlet bottom outlet function layout
  • 相关文献

参考文献1

二级参考文献1

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部