3LENSTRA J K, RINNOOY K. Complexity of vehicle routing and scheduling problem [J]. Networks, 1981,11(2).
4孙国正.广义优化理论与方法[M].北京:人民交通出版社,1997.
5KUO R J,CHIU C Y,LIN Y J. Integration of fuzzy theory and ant algorithm for vehicle routing problem with time window [A]. Annual Meeting of the North American Fuzzy Information Processing Society [C]. Piscataway, N J, USA: Institute of Electrical and Electronics Engineers Inc.,2004,16(2):925-930.
6IPCC.2006 IPCC Guidelines for National Greenhouse Gas Inventories[]..2006
7G. rebitzera,T.Ekvallb,R. Trischknecht, et al.Life cycle assessment Part 2: Current impact assessment Practice[].Environmental International.2004
8Guinee JB,Gorree M,Heijungs R,et al.Life cycle assessment:An operational guide to the ISO standards[]..2001