摘要
本文以曹村矿主斜井为研究背景,对工程的水文地质条件进行分析,针对主斜井长期淋水的隐患,提出了注浆堵水的加固方案,取得了良好的堵水效果。
In this paper, the hydrogeological conditions of Caocun Mine are analyzed, and the reinforcement scheme of grouting and plugging is put forward according to the hidden dangers of long-term water leaking in the main inclined shaft, and a good water shutoff effect is achieved.
作者
黄向良
黄勇
司广宏
Huang Xiang-liang;Huang Yong;Si Guang-hong(Shanxi Lu'an Group Yuwu coal industry limited liability company, Shanxi Changzhi 046103)
出处
《山东煤炭科技》
2017年第2期142-144,共3页
Shandong Coal Science and Technology
关键词
斜井
分层次
注浆
耦合
inclined shaft
hierarchical
grouting
coupling