摘要 悬臂现浇箱梁施工中为保证悬臂结构的稳定,通常会采用落地支架系统作为支撑体系。也有一些不具备落地支架施工所需的场地,墩顶临时固结技术很好地解决了这一问题,文章结合贵阳八里庄大桥临时固结的实际应用,为不具备采用落地支架施工0号块的桥梁施工提供参考。 In order to ensure the stability of cantilever structure in the construction of cantilever cast-in-place box girder,the floor support system is usually used as the support system.Sometimes,there is no construction site the floor support system required for,so the top pier temporary consolidation technology is a good solution.Based on the actual application of Guiyang Balizhuang bridge temporary consolidation,to provide reference for bridge construction which does not have the floor support construction of Block0.
作者 寇青 KOU Qing(China Railway First Group Co.,Ltd.,Xi'an 710000,China)
出处 《价值工程》 2017年第10期136-137,共2页 Value Engineering
关键词 悬臂箱梁 0号块 临时固结 施工技术 cantilever box girder Block 0 temporary consolidation construction technology
  • 相关文献

参考文献2

二级参考文献11

共引文献4

同被引文献7

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部