摘要
The injector II RFQ accelerator for ADS LINAC had realized 10 mA CW beam acceleration in 2014, and it is the rst milestone for the ADS superconducting LINAC. The main task of the RFQ in 2015 was to maintain a stable and reliable operation status to provide the necessary beam for the commissioning of subsequent superconducting cavities.