摘要
The kicker system in the Heavy Ion Research Facility in Lanzhou (HIRFL) plays an important role in beam extraction and injection between two cooling storage rings (CSRs). The old kicker control system which has been operated over 5 years cannot satisfy the requirements of current special physics experiments. The main reason is the 5 ns time precision restricts the improvement of the precision for the phase detection of the beam bunches.