期刊文献+

6-14 Beam Commissioning of Superconducting Demo Facility

下载PDF
导出
摘要 The demo facility of China ADS injector II was installed in the tunnel in 2014. The on-site layout of demofacility is shown in the Fig. 1. The demo facility mainly inculdes ECRIS, LEBT, RFQ, MEBTTCM and Dplate.The TCM is composed by one Superconducting(SC) HWR cavity and two SC solenoids.The beam tuning began at September of 2014. The beam commissioning procedure mainly includes three steps.Calibration of single hardware. In this step, buncher cavity, SC HWR cavity and BPM offset are calibrated withbeam to make sure the parameter of the hardwares agree with the off-line measured value. The beam parametersare chosen to be 10 mA, 1 Hz and less than 200 s. From the results, the voltage of HWR cavity and bunchercavities agree well with the measurement with X-ray method. The offset between BPM electric center and quadruplemagnetic center is less than 0.6 mm, which is reasonable according to the mechanical alignment result.
机构地区 不详
出处 《IMP & HIRFL Annual Report》 2014年第1期265-265,共1页 中国科学院近代物理研究所和兰州重离子研究装置年报(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部