4Miller D. Visual pro ject planning and scheduling: A personal app roach to p m jectmanagement[ M ]. The 15th St reet Press, 1994:67 - 75.
5K. R. MacCrimmon and C. A. Ryavec. An Analytical Study of the PERT Assumptions[ J]. OPns. Res, 1964(12) :6 - 17.
6Zou P X W, Zhang G, Wang J. Understanding the key risks in construction projects in China [J]. International Journal of Project Management, 2007, 25(6) : 601.
7Lam K C, Wang D, Lee P T K, et al. Modelling risk allocation decision in construction contracts[J]. International Journal of Project Management, 2007, 25(5): 485.
8Schatteman D, Herroelen W, Van de Vonder S, et al. Methodology for integrated risk management and proactive scheduling of construction projects[J]. Journal of Construction Engineering and Management, 2008, 134(11) : 885.
90kmen C), 6zta A. Construction proiect network evaluation with correlated schedule risk analysis model [J]. Journal of Construction Engineering and Management, 2008, 134 ( 1 ) .. 49.
10Baccarini D, Archer R. The risk ranking of projects: A methodology[J]. International Journal of Project Management, 2001, 19(3): 139.