期刊文献+

京杭大运河连续梁拱0#块临时固结支座施工 被引量:2

Construction of Temporary Consolidation Bearing of 0# Block of the Continuous Beam Arch in Beijing-Hangzhou Grand Canal Bridge
下载PDF
导出
摘要 宁启复线电化工程京杭大运河特大桥主跨采用(65+114+65)m预应力混凝土连续梁拱跨越京杭大运河。两个主墩全部位于京杭大运河中,中支点横隔板厚度为3.5m,墩身宽度为3.8m,故临时固结无法采用体内固结,需采用体外固结,本文主要介绍京杭运河特大桥主跨0#块临时固结支座设计优化、结构受力计算和施工注意事项,为以后采用体外临时固结的连续梁(刚构)桥施工提供了一定的借鉴。 The main span of the Beijing-Hangzhou Grand Canal Bridge uses(65+114+65)m prestressed concrete continuous beamarch span.Two main piers are all located in Beijing-Hangzhou Grand Canal,whose diaphragm thickness is3.5m,and width is3.8m,so thetemporary consolidation can not apply internal consolidation,should use external consolidation.This paper mainly introduces the designoptimization of temporary consolidation support of main span0#block in Beijing-Hangzhou Grand Canal Bridge,structural calculation andconstruction precautions,so as to provide a reference for the continuous beam bridge construction(rigid frame)using external temporaryconsolidation technology.
作者 陶雷 TAO Lei(Jiangsu Engineering Branch,China Railway 24 Bureau Group Co.,Ltd.,Nanjing 210046,China)
出处 《价值工程》 2017年第16期109-112,共4页 Value Engineering
关键词 连续梁拱 体外固结 0#块 continuous beam arch external consolidation 0# block
  • 相关文献

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部