基于BIM的某大坝施工应用方案研究 被引量:1

Study on Application Scheme of a Dam Construction Based on BIM
下载PDF
导出
摘要 基于大型土建工程的工程规模大、工程复杂、施工强度高、相互交叉作业、相互制约工期、施工干扰大,在施工方案中应用BIM软件,可以使工程技术人员得到很好的沟通和提高生产效率,通过参数模型整合各种信息,虚拟施工,碰撞检查,减少返工,冲突的调用来提高生产效率,节约成本和缩短工期。 Based on the large-scale civil engineering project,engineering complex,high construction intensity,cross operation,mutualrestriction period,big construction disturbance,the application of BIM software in construction project,can make engineering and technicalpersonnel get good communication and improve the production efficiency.Through parameter model to integrate all kinds of information,virtual construction,collision check,to reduce rework,conflict call can improve the production efficiency,save cost and shorten constructionperiod
作者 陈教科 CHEN Jiao-ke(Faculty of Civil Engineering and Architecture,Kunming University of Science and Technology,Kunming 650000,China)
出处 《价值工程》 2017年第17期222-223,共2页 Value Engineering
关键词 大坝 BIM 总工布置 三维方量 dam BIM general layout 3D volume
  • 相关文献

参考文献4

二级参考文献15

共引文献437

同被引文献12

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部