导出
摘要 为提升流水线产能评估的有效性,采用基于设备运作的故障发生机制生成故障节点,并按照可用度最大化原则确立预防性维护周期,采用抽样仿真方法评估流水线系统的产能,同时提出一种基于故障期望次数的近似方法以提升产能的评估效率.仿真实验表明,流水线产出率与系统配置密切相关,设备数量越少,缓存空间越大,对应的产出率就越高,但设备数量与缓存空间的边际影响逐渐下降;而近似方法获得的产出率估值与仿真值之间的偏差可基本控制在5%以内,评估准确性具有一定优势. In order to improve the effectiveness of capacity evaluation for the production line,theoperation-dependent failure is adopted to model the failure distribution,and the preventive maintenance isimplemented to restore machine state during the production process.Simulation approach is used to evaluate thethroughput,and an approximate method based on the expected failure number is also proposed to improve theevaluation efficiency.The numerical experiment shows that the throughput is closely related to the systemconfiguration.The less machine number and the larger buffer size,the higher throughput,but the marginalimpact decreases.The test also indicates that at different initial age,the average deviation between theapproximate method and the simulation is less than5%in most cases,which suggests the acceptable accuracy.
作者 张岳君 方志梅 陆阳冰 ZHANG Yue-jun;FANG Zhi-mei;LU Yang-bing(Faculty of Mechanical Engineering & Mechanics, Ningbo University, Ningbo 315211, China;Shanghai Container Terminal Industry Co., Ltd., Shanghai 200940, China)
出处 《宁波大学学报(理工版)》 CAS 2017年第4期1-5,共5页 Journal of Ningbo University:Natural Science and Engineering Edition
基金 国家自然科学基金(60874083) 浙江省教育厅科研项目(Y200907622) 宁波大学科技学院预研项目(003-21021003)
关键词 流水线 预防性维护 故障 缓存 仿真 production line preventive maintenance failure buffer simulation
  • 相关文献

参考文献2

二级参考文献8

  • 1LINN R,ZHANG W.Hybrid flow shop scheduling:a survey[J].Computers and Industrial Engineering,1999,37(1-2):57-61.
  • 2NAWAZ M,ENSCROE J E E,HAN I.A heuristic algorithm for the m-machine,n-job flow-shop sequencing problem[J].The International Journal of Management Science,1983,11(1):91-95.
  • 3ALLAOUI H,ARTIBL A.Integrating simulation and optimization to scheduling a hybrid flow shop with maintenance constraints[J].Computers and Industrial Engineering,2004,47(4):431-450.
  • 4THOMAS W S,GEORGE S.Combined production and maintenance scheduling for multiple-product,single machine production system[J].Production and Operations Management,2000,9(4):379-399.
  • 5GAO J,GEN M,SUN L.Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm[J].Journal of Intelligent Manufacturing,2006,17(4):493-507.
  • 6CASSADY C R,KUTANOGLU E.Minimizing job tardiness using integrated preventive maintenance planning and production scheduling[J].IIE Transactions,2003,35(6):503-513.
  • 7AGGOUNE R.Minimizing the makespan for the flow shop scheduling problem with availability constraints[J].European Journal of Operational Research,2004,153(3):534-543.
  • 8TAILAND E.Some efficient heuristic methods for the flow shop sequencing problems[J].European Journal of Operational Research,1990,47(3):65-74.

共引文献28

同被引文献26

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部