装配整体式混凝土结构建造技术及应用

Construction technology and application of prefabricated integral concrete structure
下载PDF
导出
摘要 装配整体式混凝土结构在陕西省刚刚起步,在设计、制造、储运、安装等环节都缺乏实际操作经验。西安建工集团通过建造一栋2层的实验楼,验证了以上所有技术环节,为装配整体式混凝土结构在本地区的推广积累了实际数据和经验。 prefabricated integral concrete structure in Shaanxi Province has just started in the design,manufacture,storage and transportation,installation and other aspects of the lack of practical experience.Through the construction of a2-story laboratory building,Xi'an Construction Group verifies all of the above technical aspects,accumulates practical data and experience for the promotion of the prefabricated integral concrete structure in the region.
作者 蓬永刚 李安永 卜韩妮 PENG Yong-gang;LI An-yong;BU Han-ni
出处 《砖瓦》 2017年第8期55-57,60,共4页 Brick-tile
基金 陕西省住房城乡建设科技科研开发计划项目(2016年度)(2015-K136)
关键词 装配整体式混凝土结构 BIM 灌浆套筒连接 prefabricated integral concrete structure BIM grouting sleeve connection
  • 相关文献

参考文献5

二级参考文献21

  • 1杜海燕,曹旭,方慕华,王鹏.SP预应力混凝土空心墙板的应用[J].建筑结构,2007,37(B01):29-30. 被引量:3
  • 2JGJ 107-2010,钢筋机械连接技术规程[S].
  • 3中国建筑科学研究院.GB50010-2010混凝土结构设计规范[s].北京:中国建筑工业出版社,2010.
  • 4苏G11-2003,预应力混凝土叠合板[S].
  • 5中国建筑科学研究院.GB50666-2011混凝土结构工程施工规范[s].北京:中国建筑工业出版社,2011.74 -75.
  • 6DG/TJ08-2069-2010,装配整体式住宅混凝土构件制作、施工质量验收规程[s].
  • 7GB50010.2010,混凝土结构设计规范[s].
  • 8Q/HDJMJ014-2010,JM钢筋灌浆直螺纹连接接头[s].
  • 9Q/HDJMJ015-2010,钢筋灌浆直螺纹连接套筒[s].
  • 10Q/CPJMJ0009-201l,CGM,JM-VI型泵送钢筋接头灌浆料[s].

共引文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部