期刊文献+

Corrigendum to “Verification of a laboratory-based dilation model for in situ conditions using continuum models” [J Rock Mech Geotech Eng6 (2014) 522e534]

下载PDF
导出
摘要 The authors regret that the photographic image in Fig. 4a of the published article was used in error, and therefore without proper referencing or permission from the originator or copyright holder. The image used in Fig. 4a of the original manuscript has been previously published by and remains under copyright by the Society for Mining, Metallurgy, and Exploration, Inc. (SME) associated with the following paper.Moalli S, Redmond S, Brox D, Procter P, Jezek D, van der Pouw Kraan M, Blanchet R, Kulka R. TBM Tunneling at the Ashlu Hydro Power Project, Squamish, BC. In: Almeraris G, Mariucci B. editors. Proceedings of Rapid Excavation and Tunnelling 2009. The Society for Mining,Metallurgy, and Exploration, Inc. (SME). 2009. pp. 1208e1217.To correct this error though this Corrigendum, Fig. 4 in this article is replaced with the following set of images. The caption remains unchanged from the original but is included here for convenience and clarity.
出处 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2017年第2期382-382,共1页 岩石力学与岩土工程学报(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部