摘要
根据"以可靠性为中心的检修(RCM)"思想,提出通过分析不同设备对系统供电可靠性的影响大小,来确定设备的检修时序,从而为检修计划的优化制订提供决策依据。该方法比其他类似方法更直接,需要的可靠性参数最少,计算最简单,计算效率最高。实际工程应用案例表明,该方法能够有效应用于配电网检修计划的优化,具有良好的科学性和实用性。
Based on the concept of u reliability-centered maintenance^(RCM),this paper introduces a method of determiningtime sequences for equipment maintenance by analyzing the impact of different equipment on the powersupply reliability of the distribution network system,which is helpful in making strategic decisions for the optimizationof the maintenance scheduling.Compared with similar methods,this one has such advantages as its directness,fewest reliability parameters needed,simplest computation and highest computational efficiency.Its application in realprojects has proved its effectiveness in the optimization of the maintenance scheduling for the distribution networkas well as its good scientificalness and practicability
作者
万凌云
王艳
王宏刚
李吉峰
赵宇琪
张盈
WAN Lingyun;WANG Yan;WANG Honggang;LI Jifeng;ZHAO Yuqi;ZHANG Ying(Electric Power Research Institute of State Grid Chongqing Electric Power Company, Chongqing 401123,P. R. China;Chongqing Normal University,Chongqing 401331 ,P. R. China;State Grid Corporation of China,Beijing 100000,P. R. China;Key Laboratory of Smart Grid of Ministry of Education of Tianjin University,Tianjin 300072,P. R. China)
出处
《重庆电力高等专科学校学报》
2017年第1期22-24,47,共4页
Journal of Chongqing Electric Power College
关键词
配电网
检修计划
可靠性评估
最优化
distribution network
maintenance scheduling
reliability assessment
optimization