期刊文献+

枕头坝一级水电站机电精细化管理 被引量:1

Mechanical and electrical fine management at Zhentouba Ⅰ Hydropower Station
下载PDF
导出
摘要 枕头坝一级水电站机电设备种类繁多,机电安装工期紧、任务重,为优质、高效推进枕头坝机电设备采购与安装工作,国电大渡河枕头坝发电有限公司从交图、交货、交面、进度、质量把控5个方面制定精细化管理措施,有效推动了机电管理各环节顺利进行。实践证明:效果好,其经验可供同行业机电精细化管理参考。 Zhentouba I Hydropower Station is designed with many kinds of mechanical and electrical equipment,but the installation period is short,which renders much difficulties.In order to carry forward the procurement and installation of equipment at high quality and high efficiency,Dadu River Zhentouba Power Generation Co.,Ltd.drafted fine management measures in respects of drawing submission,equipment delivery;work face transfer,progress and quality control.As demonstrated by practice,these measures effectively promote smooth advancing of various links of mechanical and electrical management.
作者 孟海娣 唐育茜 陈宇浩 MENG Hai-di;TANG Yu-xi;CHEN Yu-hao(Dadu River Zhentouba Power Generation Co., Ltd., China Guodian, Leshan 614700, China;Dadu River Dagangshan Hydropower Development Co., Ltd., China Guodian, Shimian 625409, China)
出处 《广西水利水电》 2017年第4期50-52,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 枕头坝一级水电站 精细化管理 机电 Zhentouba I Hydropower Station fine management mechanical and electrical
  • 相关文献

参考文献2

二级参考文献2

共引文献4

同被引文献7

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部