摘要
分析了南钢总降变电站综合自动化系统存在的问题,使用UCOMM系统制定了进行改造的过程与步骤,有效解决了通讯中断与数据丢失的问题,确定了系统稳定运行。
The existing problems in the overall automation system of Nanjing Steel’s main substation are analyzed.UCOMM system was used to draw up the process and steps of the transformation,which effectively solved the problem of communication interrupts and data loss and ensured the stable operation of the system.