4HARBAUGH A W. A Computer Program for Calculating Water Budget Using Results from the U. S. Geological Survey Modular Three-dimensional Finite-difference Groundzewater Flow Model [R].U.S.Geological Survey Open-File Report, 1990: 90-392.
5GREENWALD R M. Documentation and User's Guide:MODMA N-An Optimization ,Module for .MODFLOW Version 4. 0[M]. HIS Geo Trans, 1998.
6HOFFMAN J I, MELAND N. The effect of an artificial lake development complex on the groundwater system[A]. Proceedings of Groundwater Pollution Conference [C]. 1971,10:1-12.