期刊文献+

非标准地铁车站机电综合管线设计探讨 被引量:3

Design and discussion of mechanical and electrical system pipeline of off-standard Metro Station
下载PDF
导出
摘要 地铁车站机电系统管线涉及专业多、安装面分散、协调量大,是进度、安全、质量控制的重难点。本文针对某非标准地铁车站,阐述了通过组织各专业管线综合规划布局并利用BIM技术开展深化设计,充分合理利用地下空间、避免管线干涉碰撞,极大提高安装施工效率,并为后期运营维护检修提供便利。 The mechanical and electrical system pipeline of the metro station involves many specialties,during the construction,the installation surface is scattered and the coordination is difficult.It is the key point and difficulty of the schedule,safety and quality control.In this paper,it is described that the pipeline of a off-standard metro station,by organizing pipeline layout with various majors in advance,promoting detailed design in a virtual environment by building3-D model with BIM,The underground space is fully and rationally utilized,the interference of pipeline collision is avoided,improving the efficiency of the installation greatly,and providing the foundation for maintenance in the metro operation.
作者 王玮 Wang Wei
出处 《智能城市》 2017年第9期32-34,共3页 Intelligent City
关键词 非标地铁站 综合管线 设计 BIM off-standard Metro Station piping systems design BIM
  • 相关文献

参考文献10

二级参考文献34

共引文献132

同被引文献10

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部