4Yin-hsuan Lee,Chuei-Tin Chang,David ShanHill Wong,Shi-Shang Jang.Petri-net based scheduling strategy for semiconductor manufacturing processes[J].Chemical Engineering Research and Design,2011,89(3).
5El-Khouly I.A.,El-Kilany,K.S.El-Sayed,A.E.Modeling and simulation of re-entrant flow shop scheduling:an application in semiconductor manufacturing[A].2009 International Conference on Computers&Industrial Engineering(CIE39)[C].2009.